Home
More Services

Green Energy Purchase (PPA)

Open-access and captive PPAs that cut your power cost and your carbon footprint.

Green Energy Purchase (PPA)
Overview
Footage

Green PPAs · in motion

Video · Toàn BDS / Pexels

Industrial and commercial consumers can cut energy costs 20–40% through well-structured green power purchases — if the regulatory, contractual and credit details are handled right.

We advise off-takers end-to-end: demand analysis, sourcing strategy, developer selection, PPA negotiation and open-access approvals.

What you get
Footage

Deliverables built for boards and lenders

Video · Toàn BDS / Pexels
Green power sourcing strategy
PPA structuring & negotiation
Open-access advisory
Developer selection & RFPs
Landed-cost modelling
Regulatory approvals support
Service Brochure

Get the Green Energy Purchase (PPA) brochure — our step-by-step process, and how we deliver your objectives in time, at optimal cost, with assured quality.

Instant PDF download — we only use your details to follow up.

Invisible bot check runs when you start typing

Watch · Green PPAs

Green PPAs, in 25 seconds.

Landmark projects · Green PPAs

The largest projects on Earth — and what they teach

Real footage of record-setting Indian and global projects, sourced from developers, utilities and credible media on YouTube. Credits link to the original channel.

Footage verified 05 Sept 2026, 10:35 pm IST
India
RTC PPA

Tata Steel × ReNew RTC Supply

966 MW RTCOdisha / Jharkhand

India's largest industrial round-the-clock RE contract — captive solar-wind-storage replacing grid power for steel.

Footage · Tata Steel · YouTube

Lessons
India
Corporate PPA

Google × Adani Khavda Hybrid PPA

Solar + windGujarat

A hyperscaler buying hybrid power directly from Khavda — corporate PPAs arriving at gigawatt-park scale in India.

Footage · Wealth Tech & Future · YouTube

Lessons
India
Group-captive

Hindalco × ReNew Captive RE

100+ MWOdisha

Aluminium smelting — India's most power-intensive industry — going green through group-captive structures.

Footage · yck reddy · YouTube

Lessons
Global
24/7 PPA

Google 24/7 CFE PPAs

Hourly-matchedGlobal

The shift from annual RE matching to hourly firm supply — the model RTC/FDRE tenders in India now emulate.

Footage · Georgia Tech Scheller College of Business · YouTube

Lessons
Market intelligence · Open access · Pan-India

Who is already buying green power on open access — state by state, customer by customer

State bubbles = green open-access capacity and consumer counts from SLDC registers and the Green Energy Open Access Registry; dots = individual C&I consumers with the capacity they have availed, the mode (captive / group-captive / third-party), the RE source and since when. A daily radar reads SLDC / registry / commission sites and adds new grants automatically.

Green OA capacity
~25,100 MW
OA energy
~80.3 TWh/yr
States tracked
23
Customers mapped
72
Capacity mapped
6,431.5 MW
Group captiveCaptiveThird-party / GOAInter-state
CustomerSectorStateLocationOA MW ▼ModeSourceSinceSupplier / IPP
ArcelorMittal Nippon SteelSteelGujaratHazira975Group captiveSolar + wind (RTC hybrid)2024Greenko (Andhra) / own
JSW Steel (Vijayanagar)SteelKarnatakaToranagallu, Ballari958Group captiveSolar (JSW Energy RE)2022JSW Energy
Vedanta AluminiumAluminiumOdishaJharsuguda580Group captiveSolar + wind (RTC)2024Serentica Renewables
Hindustan ZincMetalsRajasthanUdaipur / Chanderiya450Group captiveSolar + wind (RTC)2023Serentica Renewables
Jindal StainlessSteelOdishaJajpur300Group captiveSolar + wind (RTC)2024ReNew
JSW Steel (Dolvi)SteelMaharashtraDolvi, Raigad250Group captiveSolar (JSW Energy)2023JSW Energy
Adani Ports (Mundra)PortsGujaratMundra250Group captiveSolar + wind2023Adani Green
Shree CementCementRajasthanBeawar / Ras220CaptiveSolar (captive parks)2018Own captive
Ambuja Cements (Adani)CementGujaratAmbujanagar, Kodinar200Group captiveSolar + wind2024Adani Green
UltraTech CementCementRajasthanKotputli / Pali150Group captiveSolar + wind (multi-state)2021Aditya Birla Renewables, Amplus
Embassy REITCommercial real estateKarnatakaBengaluru (Manyata / Techzone)100CaptiveSolar (own 100 MW park)2018Embassy Energy (Bellary)
Hyundai Motor IndiaAutomotiveTamil NaduSriperumbudur100Group captiveSolar (group captive park)2024Fourth Partner Energy
Hindalco (Mahan)AluminiumMadhya PradeshSingrauli100CaptiveSolar2024Aditya Birla Renewables
Amazon Data ServicesData centresTelanganaHyderabad100Third-party OA (GOA)Solar (Amazon PPAs)2022ReNew, Amp Energy, Vibrant
Delhi Metro Rail Corp.TransportDelhiNew Delhi99Inter-state OASolar (Rewa, MP)2019Rewa Ultra Mega Solar
Dalmia Bharat CementCementTamil NaduDalmiapuram60Group captiveWind + solar2020Own + IPP
Tata Steel (Meramandali)SteelOdishaDhenkanal60Group captiveSolar2023Tata Power Renewables
InfosysIT servicesKarnatakaBengaluru & Mysuru campuses60Third-party OA (GOA)Solar (Pavagada)2017Own 60 MW Sira park + IPPs
MicrosoftData centresTelanganaHyderabad60Third-party OASolar2023ReNew
Indian Railways (traction)TransportMadhya PradeshRewa / multiple50Inter-state OASolar (Rewa)2020RUMSL
Jindal Steel & PowerSteelChhattisgarhRaigarh50CaptiveSolar2023Own
GoogleData centresMaharashtraNavi Mumbai50Third-party OAWind-solar hybrid2024CleanMax
NTT Global Data CentersData centresMaharashtraNavi Mumbai50CaptiveSolar (own parks)2022NTT captive solar
ITC LtdFMCG / paperTelanganaBhadrachalam50CaptiveWind + solar2015Own wind farms
Maruti SuzukiAutomotiveHaryanaManesar & Gurugram45CaptiveSolar (captive + OA)2020Own + IPP
DLF Cyber CityCommercial real estateHaryanaGurugram40Third-party OA (GOA)Solar + wind2023Multiple
Vardhman TextilesTextilesPunjabLudhiana / Baddi40Group captiveSolar2021Multiple
Yotta Data ServicesData centresMaharashtraPanvel (Integrated Data Centre Park)40Third-party OASolar + wind2023Multiple
Hindalco (Renukoot)AluminiumUttar PradeshRenukoot40CaptiveSolar2024Aditya Birla Renewables
Bangalore International AirportAirportsKarnatakaDevanahalli40Third-party OASolar + wind2020Multiple
Bharat ForgeEngineeringMaharashtraPune (Mundhwa) & Baramati40Group captiveSolar + wind2020Cleanmax / own captive
MRFTyresTamil NaduArakkonam / Perambalur40CaptiveWind (captive)2016Own wind
Grasim (Aditya Birla)Chemicals & textilesGujaratVilayat, Bharuch40Group captiveSolar2022Aditya Birla Renewables
Saint-Gobain IndiaGlassTamil NaduSriperumbudur35Group captiveSolar2022Fourth Partner Energy
Trident GroupTextilesPunjabBarnala30Group captiveSolar2022Multiple
Dalmia Bharat (Cuttack)CementOdishaKapilas30Group captiveSolar2022Own + IPP
Mindspace REITCommercial real estateMaharashtraAiroli / Pune30Group captiveSolar2023Multiple
Ashok LeylandAutomotiveTamil NaduEnnore & Hosur30Third-party OAWind + solar2019Multiple IPPs
Dr. Reddy's LaboratoriesPharmaTelanganaHyderabad (Bachupally) & Vizag30Group captiveSolar2021Fourth Partner / Sprng
Toyota Kirloskar MotorAutomotiveKarnatakaBidadi30Group captiveSolar + wind2021Fourth Partner / Cleanmax
Tata Consultancy ServicesIT servicesMaharashtraPune (Hinjawadi/Sahyadri Park)30Third-party OASolar + wind2021Tata Power Renewables
STT GDC IndiaData centresMaharashtraNavi Mumbai / Pune30Third-party OASolar + wind2023Tata Power Renewables
Aurobindo PharmaPharmaTelanganaHyderabad25Group captiveSolar2022Multiple
Sify TechnologiesData centresMaharashtraNavi Mumbai (Rabale)25Third-party OASolar2023Multiple
Bajaj AutoAutomotiveMaharashtraChakan & Waluj25Third-party OAWind + solar2019Multiple IPPs
WiproIT servicesKarnatakaBengaluru (Sarjapur/Electronic City)25Third-party OASolar2018Multiple IPPs
Amara Raja Energy & MobilityBatteriesAndhra PradeshTirupati25Captive + group captiveSolar2020Own + IPP
Mumbai Metro / MMRDATransportMaharashtraMumbai25Third-party OASolar2023Multiple
Bosch IndiaEngineeringKarnatakaBengaluru (Adugodi) & Bidadi20Third-party OASolar2019Multiple IPPs
TVS MotorAutomotiveTamil NaduHosur20Group captiveWind + solar2020Fourth Partner / own
Sun PharmaPharmaGujaratHalol / Ankleshwar20Group captiveSolar2022Multiple
Divi's LaboratoriesPharmaAndhra PradeshVisakhapatnam20Group captiveSolar2023Multiple
Cummins IndiaEngineeringMaharashtraPune (Kothrud/Phaltan)20Group captiveWind + solar2019Multiple
Delhi International Airport (DIAL)AirportsDelhiNew Delhi20Third-party OA (inter-state)Solar (Bhadla) + hydro2022Multiple
Mahindra & MahindraAutomotiveMaharashtraChakan20Group captiveSolar2022Mahindra Susten / Cleantech Solar
Brookfield India REITCommercial real estateHaryanaGurugram / Noida20Third-party OASolar2023Multiple
Apollo TyresTyresGujaratLimda, Vadodara20Group captiveSolar2023Cleanmax
CEATTyresMaharashtraNashik / Bhandup18Group captiveSolar + wind2021Multiple
Hero MotoCorpAutomotiveHaryanaGurugram & Dharuhera15Group captiveSolar2021Amplus / Cleanmax
Godrej IndustriesFMCG / chemicalsMaharashtraVikhroli / Ambernath15Group captiveSolar + wind2021Multiple
Tata MotorsAutomotiveMaharashtraPune (Pimpri & Chikhali)12.5Captive + GOASolar (captive rooftop + OA)2021Tata Power Renewables
LupinPharmaMaharashtraTarapur / Aurangabad12Group captiveSolar2022Cleantech / Amplus
CiplaPharmaGoaVerna10Third-party OASolar2021Multiple
Nestlé IndiaFMCGPunjabMoga8Group captiveSolar2022Multiple
Tata Motors (Sanand)AutomotiveGujaratSanand8Group captiveWind-solar hybrid2023Tata Power Renewables
Volvo Group IndiaAutomotiveKarnatakaHoskote8Third-party OASolar2020Multiple
Britannia IndustriesFMCGKarnatakaBengaluru6Third-party OASolar2021Multiple
Kirloskar BrothersEngineeringMaharashtraKirloskarvadi / Dewas6Group captiveSolar2022Multiple
Coca-Cola India (HCCB)BeveragesKarnatakaBidadi6Group captiveSolar2022Multiple
Pepsico / Varun BeveragesBeveragesUttar PradeshGreater Noida5Group captiveSolar2023Multiple
Bajaj Finserv / Bajaj Group officesFinancial servicesMaharashtraPune5Third-party OASolar2022Multiple
Dabur IndiaFMCGUttarakhandRudrapur (SIDCUL)5Group captiveSolar2023Multiple
72 customers · 6,432 MW shown

Growthifye does not take responsibility for the accuracy of this information. Open-access capacities are compiled from SLDC open-access registers, the Green Energy Open Access Registry, SERC/CEA publications and the consumers' own disclosures (annual reports / press releases), parsed automatically and shown with their source. Verify with the SLDC / DISCOM before relying on any figure. Radar reads only SLDC open-access registers, the Green Energy Open Access Registry, SERC, CEA, MoP and Grid-India domains.

Key OEMs & Ecosystem

The technology and partner ecosystem we work across.

Leading RE Developers

ReNew logoReNew
Tata Power logoTata Power
Adani Green logoAdani Green
Greenko logoGreenko
Ayana Renewable logoAyana Renewable
Amplus Solar logoAmplus Solar
CleanMax logoCleanMax
Fourth Partner logoFourth Partner
O2 Power logoO2 Power
Serentica logoSerentica
ReNew logoReNew
Tata Power logoTata Power
Adani Green logoAdani Green
Greenko logoGreenko
Ayana Renewable logoAyana Renewable
Amplus Solar logoAmplus Solar
CleanMax logoCleanMax
Fourth Partner logoFourth Partner
O2 Power logoO2 Power
Serentica logoSerentica
Blogs · A new article every day

Expert insights on Green PPAs.

All blogs
State-Wise Open Access Solar Economics in India 2026: Banking vs No-Banking

State-Wise Open Access Solar Economics in India 2026: Banking vs No-Banking

A practitioner guide to state-wise open access solar economics in India 2026, comparing banking, charges, CUF and landed cost.

Sudarshan Karweer2026-10-01
Interstate Open Access in India 2026: ISTS Waiver, Charges and C&I PPA Economics

Interstate Open Access in India 2026: ISTS Waiver, Charges and C&I PPA Economics

A practitioner guide to ISTS waivers, interstate open access charges, scheduling and landed-cost economics for C&I PPAs in India 2026.

Sudarshan Karweer2026-10-01
Open Access Scheduling & DSM in India 2026: Forecasting, Deviations and PPA Risk

Open Access Scheduling & DSM in India 2026: Forecasting, Deviations and PPA Risk

A 2026 practitioner guide to open access scheduling, DSM, forecasting risk and landed-cost control for Indian C&I PPAs.

Sudarshan Karweer2026-09-30
RTC and Hybrid Open Access PPAs in India 2026: C&I Cost, Risk and Design

RTC and Hybrid Open Access PPAs in India 2026: C&I Cost, Risk and Design

A 2026 practitioner guide to RTC and hybrid open access PPAs in India: firming options, charges, banking limits and landed-cost design.

Sudarshan Karweer2026-09-30
Third-Party vs Group Captive Open Access PPAs in India 2026: Cost and Strategy

Third-Party vs Group Captive Open Access PPAs in India 2026: Cost and Strategy

A 2026 practitioner guide to third-party vs group captive open access PPAs in India: charges, banking, compliance and landed cost economics.

Sudarshan Karweer2026-09-29
Third-Party vs Group Captive Open Access in India 2026: PPA Economics Guide

Third-Party vs Group Captive Open Access in India 2026: PPA Economics Guide

A 2026 practitioner guide to third-party vs group captive open access in India: charges, compliance, banking and landed cost economics.

Sudarshan Karweer2026-09-29
Open Access Banking in India 2026: C&I PPA Economics, Risk and State Strategy

Open Access Banking in India 2026: C&I PPA Economics, Risk and State Strategy

A practitioner guide to open-access banking in India 2026: state rules, charges, settlement design and landed-cost impact for C&I PPAs.

Sudarshan Karweer2026-09-28
Open Access Banking in India 2026: Rules, Charges and PPA Economics

Open Access Banking in India 2026: Rules, Charges and PPA Economics

A practitioner guide to open access banking in India 2026: state rules, charges, settlement design and landed-cost impact for C&I PPAs.

Sudarshan Karweer2026-09-28
Captive Eligibility in Open Access PPAs India 2026: Rules, Risks and Landed Cost

Captive Eligibility in Open Access PPAs India 2026: Rules, Risks and Landed Cost

A 2026 practitioner guide to group captive eligibility, compliance tests, banking, RPO and landed-cost risk in Indian open access PPAs.

Sudarshan Karweer2026-09-27
Open Access RPO and Captive Compliance India 2026: C&I PPA Risk and Economics

Open Access RPO and Captive Compliance India 2026: C&I PPA Risk and Economics

A practical 2026 guide to RPO, captive tests, approvals, and landed-cost impacts in Indian open access PPAs.

Sudarshan Karweer2026-09-27
Start a conversation

Discuss your green ppas mandate.

Tell us where you are in the journey — we'll respond within one business day with a tailored engagement outline.

Invisible bot check runs when you start typing

We use essential cookies to run the site and, with your consent, track your activity to personalise your learning and recommendations. See our Privacy Policy.