Every approval, every state — from single window to COD
Click a state for its single-window portal, STU / CTU connectivity, CEIG drawing approval & inspection, fire NOC, permission to charge (Format I & II), commissioning & COD and PM-KUSUM — each step marked online or manual with the procedure, documents and official links. Blue dots are STU substations with capacity available for injection (as-on date shown).




















Shade = share of steps filed online · 0 substations plotted · link check pending
Select a state on the map or from the chips above.
Procedures summarised from CEA / CERC regulations and state RE policies; portal links point to official government domains and are re-checked weekly. Where a step is marked MANUAL the state has no online filing — the procedure describes the physical process. Verify current timelines with the nodal agency.