Today · 05 Sept
India mandates battery storage for all new solar/wind projects from July 2027, reshaping project economics ◆ BESS: India proposes mandatory battery storage for new renewable projects from 2027 ◆ Policy: India becomes world's third-largest renewable capacity holder: Joshi ◆ Policy: Report calls for fixing India's low-tariff renewable auction model ◆ Grid: Ceigall wins ₹5,300-crore transmission project as grid constraints bite ◆ Hydrogen: India launches first hydrogen-powered train for green rail mobility ◆ Solar: SECI floats 700 MW solar tender for commercial and industrial users ◆ India mandates battery storage for all new solar/wind projects from July 2027, reshaping project economics ◆ BESS: India proposes mandatory battery storage for new renewable projects from 2027 ◆ Policy: India becomes world's third-largest renewable capacity holder: Joshi ◆ Policy: Report calls for fixing India's low-tariff renewable auction model ◆ Grid: Ceigall wins ₹5,300-crore transmission project as grid constraints bite ◆ Hydrogen: India launches first hydrogen-powered train for green rail mobility ◆ Solar: SECI floats 700 MW solar tender for commercial and industrial users

Markets · Energy & Grid Intelligence

India energy & grid map

Updated as on —

State-wise installed capacity and FY31 plans for solar, wind, hydro, small hydro, nuclear, storage and green hydrogen; the transmission network with utilisation, planned lines, substations, HVDC and STATCOMs, NLDC / RLDC / SLDC pins and bottleneck corridors; and every tracked BESS & pumped-storage project. CEA/MNRE month 2026-06-30; revised daily from credible prints.

Solar

117.3 GW

Wind

50.5 GW

Hydro + SHP

53.1 GW

Nuclear

8.9 GW

HVDC operational

30.5 GW

HVDC pipeline

29 GW

BESS installed

740 MWh

PSP installed

5 GW

Storage pipeline

118.6 GWh

Projects tracked

35

YearFY26installed (CEA/MNRE)

Darker lime = higher value · click a state for its full snapshot

Top states — Solar

Click any state on the map for capacity, FY31 trajectory, transmission facts, bottlenecks, storage projects and the latest credible prints.

Daily scan — capacity · transmission · storage prints

First scan runs at 02:20 UTC daily.

Sources & method

  • · CEA installed capacity & transmission reports
  • · MNRE physical progress (state-wise)
  • · NEP 2022-32 / CTUIL transmission plan
  • · Grid-India (NLDC/RLDC) reports
  • · SECI / GUVNL / NTPC / state tenders
  • · IESA public releases
  • · credible headlines scanned daily (Mercom, ET Energy, PIB, Business Standard…)

Indicative desk figures as of the CEA/MNRE month shown; headline-verified revisions are marked LIVE. Not a substitute for CEA/MNRE official publications.