Intel · Growthifye tariff estimates · e-Reverse auctions · Feasibility desk

Every storage & hybrid auction — Growthifye's estimate of what was discovered, and whether it holds

Growthifye estimate — for guidance only. Figures are compiled from public sources and Growthifye's own models and may be incomplete, outdated or inaccurate. Growthifye Advisory, its directors, employees, partners, associates and affiliates accept no responsibility or liability for the accuracy of this data or for any decision, loss or damage arising from its use; users indemnify Growthifye against any such claim. Verify with the procurer, regulatory commission or official notification before relying on any figure. Not investment, legal or tax advice.

Share this deskWhatsAppLinkedInX

Standalone BESS, BESS + Solar, FDRE, RTC, PM-KUSUM and solar-pump benchmarks — who floated it, when the e-RA was held, who won, what the cell and container cost that day, and whether the tariff clears Growthifye's financial model (equity IRR ≥ 15%, project IRR ≥ 12%, DSCR & current ratio ≥ 1.2).

Free views left this month: 3 of 3 · resets every 30 daysToday · LFP cell $46.2/kWh · container $65.5/kWh

Growthifye tariff estimate over time · bubble = MW · colour = verdict

20222023202420252025036912

Desk verdicts · Standalone BESS

Challenging10
Good rate0
Very good rate1

Verdict compares the discovered tariff with the tariff our model needs for a 15% equity IRR (adjusted for procurer rating). Open a row to run your own assumptions.

PCS costed as grid-forming (GFM) · CEA advisory CEA-PS-11-20(12)/1/2026-PSPA-I (Advisory dated 10 July 2026; clarification on applicability issued subsequently) · +2.0% on storage capex · wording as reported, official verbatim pending desk confirmation
“The Central Electricity Authority (CEA) has advised the implementation of 100 percent Grid-Forming Inverters (GFMs) in all upcoming Battery Energy Storage System (BESS) projects. GFM BESS must be capable of stable operation across a wide range of system strengths, including weak-grid conditions corresponding to an SCR of 2.0 or lower at the point of interconnection, and must provide autonomous and near-instantaneous frequency and voltage support. A short-term current overload capability of at least 1.5 pu for a minimum of 200 milliseconds is recommended; the BESS must be capable of damping power-system oscillations within the 0.1–20 Hz range. GFM controls must remain operational whenever the BESS is connected to the network and must not change operating mode during network disturbances. Active-power response to RoCoF events must begin within 5 milliseconds and be maintained for at least five seconds; reactive-power reaction time is capped at 5 milliseconds with a response time of not more than 30 milliseconds following a voltage change; the BESS must withstand a momentary voltage phase-angle jump of up to ±60 degrees without disconnecting. GFM BESS with an aggregate capacity of 50 MW and above must be capable of providing black-start support, participate continuously in AGC on a 24x7 basis, and support seamless bidirectional operation with no cooling period between charging and discharging. The advisory takes effect from 10 July 2026 and applies to all upcoming BESS projects of 50 MW and above; BESS projects for which bids are concluded by 10 August 2026, or where purchase orders were placed before 10 July 2026, are not required to comply.”
Auction / programmeProcurerSizee-RATariffCell $/kWhContainer $/kWhTermVerdict
SECI BESS 4-hour · 1,000 MW / 4,000 MWh (2025 tranche)Growthifye estimateSECI1,000 MW / 4,000 MWh2025-08-20₹2.05 L/MW/mo477015 yChallenging
KPTCL/Karnataka BESS · 500 MW / 1,000 MWhGrowthifye estimateKarnataka ESCOMs (via KPTCL)500 MW / 1,000 MWh2025-06-10₹2.4 L/MW/mo487012 yChallenging
NVVN BESS · 500 MW / 1,000 MWh (Rajasthan)Growthifye estimateNVVN (NTPC)500 MW / 1,000 MWh2025-04-10₹2.19 L/MW/mo497012 yChallenging
MSEDCL standalone BESS · 1,500 MW / 3,000 MWh (Case 51 of 2025)Growthifye estimateadoptedMSEDCL1,500 MW / 3,000 MWh2025-03-05₹2.2 L/MW/mo507012 yChallenging
SJVN BESS · 500 MW / 1,000 MWhGrowthifye estimateSJVN500 MW / 1,000 MWh2025-02-20₹2.23 L/MW/mo507012 yChallenging
RVUNL/RUVNL BESS · 500 MW / 1,000 MWh (Rajasthan)Growthifye estimateRUVNL500 MW / 1,000 MWh2025-01-30₹2.27 L/MW/mo507012 yChallenging
BRPL Kilokari BESS · 20 MW / 40 MWh (Delhi, first DISCOM-side BESS)Growthifye estimateBRPL20 MW / 40 MWh2025-01-15₹5.7 L/MW/mo507012 yVery good rate
GUVNL BESS Phase-III · 500 MW / 1,000 MWhGrowthifye estimateGUVNL500 MW / 1,000 MWh2024-09-25₹3.99 L/MW/mo527012 yChallenging
SECI BESS (VGF) · 500 MW / 1,000 MWhGrowthifye estimateSECI500 MW / 1,000 MWh2024-06-20₹3.81 L/MW/mo557012 yChallenging
GUVNL BESS Phase-I · 250 MW / 500 MWhGrowthifye estimateadoptedGUVNL250 MW / 500 MWh2024-02-15₹4.49 L/MW/mo627012 yChallenging
SECI BESS-I · 500 MW / 1,000 MWh (Rajasthan, Fatehgarh-III)Growthifye estimateadoptedSECI500 MW / 1,000 MWh2022-08-24₹10.84 L/MW/mo1257012 yChallenging

Tariff alerts

Get a Vidura note the moment a new tariff estimate is logged — the price as reported, who won, and our view on whether it is sustainable. Growthifye estimates, for guidance only.

One e-mail per discovered tariff; unsubscribe link in every mail.

Growthifye estimate — for guidance only. All tariffs, dates, awards and verdicts on this desk are Growthifye's estimates compiled from public tender results, commission filings, trade press and Growthifye's own financial model; they may be incomplete, outdated or inaccurate. Growthifye Advisory, its directors, employees, partners, associates and affiliates accept no responsibility or liability for the accuracy of this data or for any decision, loss or damage arising from its use, and users agree to indemnify Growthifye against any such claim. Verify with the procurer, regulatory commission or official notification before relying on any figure. Not investment, legal or tax advice.

Growthifye estimate — for guidance only. Figures are compiled from public sources and Growthifye's own models and may be incomplete, outdated or inaccurate. Growthifye Advisory, its directors, employees, partners, associates and affiliates accept no responsibility or liability for the accuracy of this data or for any decision, loss or damage arising from its use; users indemnify Growthifye against any such claim. Verify with the procurer, regulatory commission or official notification before relying on any figure. Not investment, legal or tax advice.

We use essential cookies to run the site and, with your consent, track your activity to personalise your learning and recommendations. See our Privacy Policy.