Utility Digitalisation & Automation
Step 01 of 4 · Utility Digitalisation & Automation

Baseline & audit

Baseline & Audit: Mapping AT&C Losses, Reliability Gaps and Digital Maturity Before You Automate

We start every digitalisation engagement with a rigorous, data-led baseline: AT&C loss decomposition, feeder-level reliability review, process mapping across metering-to-billing and outage workflows, and a structured maturity assessment of SCADA/DMS, AMI and control-room systems. This gives your leadership an evidence-based starting point before any technology or automation investment is committed.

Typical duration · 6–9 weeks for a single distribution circle (110–150 feeders); scales with circle count and data availability

Samples generated 07 Sept 2026, 02:06 am IST

What happens in this step

  1. 01Kick-off workshops with distribution, metering, IT/OT and commercial teams to align scope, boundaries and success metrics
  2. 02AT&C loss decomposition by feeder/DT using energy audit, billing and collection data; identification of technical vs commercial loss drivers
  3. 03Reliability data review (SAIDI/SAIFI, feeder tripping logs, DT failure rates) benchmarked against CEA/state norms
  4. 04Process mapping of metering-to-cash, outage restoration and asset maintenance workflows to locate manual bottlenecks
  5. 05Digital & automation maturity assessment across SCADA, DMS, AMI, GIS and control-room systems using a structured scoring framework
  6. 06Site and control-room visits to validate data quality, sensor coverage and existing automation footprint
  7. 07Consolidation into a gap register and baseline scorecard, reviewed jointly with the client before moving to prioritisation
Footage

Baseline & audit · on the ground

Video · Edouard Matte / Pexels

What we need from you

  • 12–24 months of feeder and DT-level energy accounting and billing/collection data
  • SAIDI/SAIFI and outage logs, DT failure and replacement records
  • Existing SCADA/DMS/AMI/GIS architecture documents and vendor contracts
  • Organisation chart and process documentation for metering, billing and O&M
  • Access to control room and sample feeder/DT sites for field validation
  • Any prior loss-reduction or smart-metering DPRs, if available
Blue sky over transmission towers on a rural landscape, symbolizing energy distribution.
Image

Your inputs, our engineering

Photo · Petr Ganaj / Pexels

Worked example (anonymised, illustrative)

Distribution Circle Digital Baseline Study · ~140 feeders, ~2,800 DTs, ~4.5 lakh consumers · Western India DISCOM circle

A mid-sized urban-rural distribution circle with AT&C losses above 18% and partial SCADA coverage sought an independent baseline before committing to a phased smart-metering and DMS rollout.

What you receive

Sample deliverables from this step

Every sample below is analyst-written and anonymised for illustration — structure and depth mirror our real deliverables; figures and names are not from any client engagement.

Illustrative — AT&C Loss & Reliability Baseline ReportIllustrative · Growthifye-prepared
report

AT&C Loss & Reliability Baseline Report

Feeder- and DT-level loss decomposition, reliability benchmarking and root-cause classification of technical, commercial and collection losses.

Sample excerpt · Feeder-wise loss & reliability snapshot (illustrative extract) — illustrative figures

Feeder IDAT&C Loss (%)SAIDI (hrs/yr)SAIFI (events/yr)Primary Loss Driver
F-01422.43814Metering gaps, DT overload
F-02714.1197Billing lag
F-03927.85119Theft/unmetered load
F-04211.6125Technical (long LT lines)
F-05819.92911DT failures
  • Figures are illustrative and anonymised for this example
  • Loss drivers cross-checked against DT metering and consumer indexing data
  • Used directly as input to the prioritisation matrix in the next step
Download illustrative sample (PDF)
Illustrative — Process & Systems Maturity MapIllustrative · Growthifye-prepared
dashboard

Process & Systems Maturity Map

Visual maturity scoring of metering-to-cash, outage management and control-room automation against a 5-level digital maturity framework.

Sample excerpt · Digital & automation maturity scorecard (illustrative extract) — illustrative figures

FunctionCurrent Level (1-5)Target LevelKey GapAutomation Readiness
SCADA/DMS coverage24Partial feeder telemetryMedium
AMI/Smart metering14No AMI deployedHigh
Outage management24Manual dispatch, no OMSMedium
GIS asset mapping34Incomplete LT network dataHigh
Billing & collection34Reconciliation delaysMedium
  • Scoring uses a 5-level maturity model (Ad hoc to Optimised)
  • Directly feeds automation and IT/OT roadmap prioritisation
Download illustrative sample (PDF)
memo

Baseline Gap Register & Data Quality Memo

Consolidated register of identified gaps across data, process and technology, flagged by severity and data confidence, used to scope the next phase.

Sample excerpt · Gap register extract — illustrative figures

Gap IDCategoryDescriptionSeverityData Confidence
G-03Metering18% DTs unmeteredHighMedium
G-07ProcessManual outage logging, 24-48hr lagHighHigh
G-11SCADAFeeder telemetry coverage <40%MediumHigh
G-15BillingConsumer indexing mismatch ~9%MediumMedium
  • Severity and confidence ratings guide sequencing in the prioritisation step
  • Data confidence flags where further field validation is recommended
Download illustrative sample (PDF)

Outcomes

  • A quantified, feeder-level view of where AT&C losses and reliability issues originate
  • An objective digital and automation maturity score benchmarked against peer utilities
  • A prioritised, evidence-based gap register ready to feed the next 'Prioritise & Design' step
  • Shared understanding across distribution, IT/OT and commercial teams on baseline performance
Footage

Outcomes that reach COD

Video · invisiblepower / Pexels

Questions clients ask

Do we need complete SCADA/AMI data before starting this audit?

No. We work with whatever data exists — billing, GIS, manual logs — and explicitly flag data gaps as part of the deliverable, rather than waiting for full digital coverage.

How is this different from a standard energy audit?

We combine loss and reliability analysis with process mapping and a formal digital maturity assessment, giving a technology-and-process view, not just an energy balance.

Can this baseline be run across multiple circles simultaneously?

Yes, the methodology is designed to scale; we typically pilot on one circle first to calibrate the scoring framework before rolling out across additional circles.

A diverse group of professionals in a business consulting office setting.
Image

Questions we answer every week

Photo · Tran Nhu Tuan / Pexels

We use essential cookies to run the site and, with your consent, track your activity to personalise your learning and recommendations. See our Privacy Policy.