RE & Energy Storage Advisory & Engineering
Capability in depth

Project Management Consultancy (PMC)

Owner-side control of schedule, cost, quality and contractors — from NTP to COD and beyond.

Project Management Consultancy (PMC)
Overview

As your PMC and owner's engineer, we run the project on your behalf with a disciplined, phase-gated regime — proven on gigawatt-scale RE programs and standalone BESS plants alike.

Resident engineers hold the line at site: 100% attendance at hold points, daily geo-tagged reporting, stop-work and reject authority, and RA-bill certification against measured physical progress only. The full nine-phase lifecycle below is what your program gets.

Scope of work
Level-3 baseline programme & schedule control
Design review & AFC drawing control
Procurement support, factory audits & FATs
Construction supervision with hold-point regime
Quality (ITP/NCR) & HSE enforcement
Earned value (SPI/CPI) & cost control
Statutory approvals & utility interface
Testing, commissioning, PG tests & COD dossiers
Defect liability & performance monitoring
The nine-phase regime

What your program gets, phase by phase

Phase 01

Mobilisation & Baselining

  • Core team & resident engineers deployed site-wise
  • Document environment, dashboards & mobile reporting live
  • Level-3 baseline programme agreed and frozen
  • Land, design & approval file audit with exception log
  • Field Quality Plans & ITPs issued per discipline
Phase 02

Design & Engineering Review

  • Design basis, DC:AC ratio, module/inverter & layout verification
  • Independent energy-yield re-run vs financial model (P50/P75/P90)
  • Civil, electrical, earthing & protection design checks
  • Evacuation & interconnection scheme review vs utility requirements
  • AFC drawing register, comments log & deviation/waiver control
Phase 03

Procurement & Contract Support

  • Technical specs & approved make lists per package
  • Independent BoQ take-off and bid evaluation with compliance matrix
  • Factory audits, FAT witness & pre-dispatch inspections
  • LD, PG, DLP & retention terms drafted into contracts
  • Milestone payment schedules tied to certified physical progress
Phase 04

Construction Supervision

  • Setting-out, civil, structure & electrical works supervision
  • 100% attendance at hold points; witness & review point control
  • Daily geo-tagged progress reports and three-week look-aheads
  • Stop-work, reject and certify authority exercised on the owner's behalf
  • RA bill certification against measured physical progress only
Phase 05

Quality & HSE Assurance

  • Hold/witness/review point regime from piling to pre-COD
  • NCR issue, ageing and closure management
  • Contractor HSE plan approval & permit-to-work oversight
  • Incident reporting within 24 hours with root cause in 7 days
  • Statutory labour & welfare compliance checks
Phase 06

Schedule & Cost Control

  • Critical-path tracking with float consumption reporting
  • Earned value (SPI/CPI) reported monthly per cluster
  • Delay analysis & recovery plans for slipping milestones
  • Variation and change-order evaluation with rate analysis
  • Lender drawdown certification against certified milestones
Phase 07

Statutory & Utility Interface

  • Connectivity, bay allocation & interconnection approvals
  • Electrical inspectorate drawing approval & energisation permission
  • Metering, testing & sealing coordination with the utility
  • Scheme & domestic-content compliance verification
  • Live approvals tracker across all sites
Phase 08

Testing, Commissioning & COD

  • Mechanical completion & punch-list closure control
  • String IV, insulation, transformer & protection testing witness
  • Charging, synchronisation & stabilisation oversight
  • Performance guarantee test conduct and certification
  • Complete COD dossier: as-builts, warranties & asset register
Phase 09

Defect Liability & Performance

  • Defect log with contractor call-out & closure tracking
  • Monthly generation vs P50/guaranteed CUF monitoring
  • PR trending with root-cause investigation of underperformance
  • O&M contract adherence & preventive maintenance audits
  • Annual thermography/EL campaigns with condition reports

State-wise regulatory navigator · 36 states & UTs · interactive India map

Which portal, which format, which office — every approval from single window to COD, state by state

Official links with the process for each step, marked online or manual, technology-specific approvals for solar, BESS, RE+BESS, wind, hydro, small hydro and green hydrogen, STU substations with capacity available for injection, plus daily portal & PM-KUSUM updates.

Single-window portalCTU / STU connectivityCEIG approvalFire NOCPermission to charge · Format I & IICODPM-KUSUM
Open the India map
Start a conversation

Need project management consultancy (pmc)?

Tell us about your project or portfolio — we'll respond within one business day with a tailored engagement outline.