Energy Management for Commercial & Industrial (C&I)
Capability in depth

BESS for C&I

Peak shaving, ToD arbitrage and DG replacement — safely.

BESS for C&I
Overview

Battery storage turns a fixed contract demand into a controllable one. A right-sized BESS shaves recorded maximum demand, shifts consumption out of peak ToD slots, replaces diesel gensets for backup and improves solar self-consumption — often with a 4–6 year payback at today's cell prices.

We size the system from your 15-minute load data, specify chemistry, PCS and fire-safety systems to CEA / IS 17387 / NFPA 855, and take it through CEIG and fire NOC.

Scope of work
15-minute load analysis and BESS sizing
Peak-shaving, ToD-arbitrage and backup use-case stacking
Chemistry, PCS and BMS specification
Fire-safety design (IS 17387, NFPA 855) and CEIG approval
Vendor RFQ and warranty / degradation terms
Integration with solar and DG (EMS logic)
Battery Waste Management Rules compliance
Performance monitoring and dispatch optimisation
Start a conversation

Need bess for c&i?

Tell us about your project or portfolio — we'll respond within one business day with a tailored engagement outline.

Invisible bot check runs when you start typing

We use essential cookies to run the site and, with your consent, track your activity to personalise your learning and recommendations. See our Privacy Policy.