Rooftop, ground & floating solar
Capex or RESCO, net or gross — sized for your load and your roof.

On-site solar is still the cheapest electricity a factory can buy. We size plants to the daytime load and sanctioned limits, choose between capex ownership and RESCO PPAs, and pick the right metering regime (net, gross or net-billing) under the state's rooftop regulations and PM Surya Ghar / DISCOM programmes.
For land-rich campuses we evaluate ground-mount and car-port options; for reservoirs and ponds, floating solar with anchoring, water-body permissions and O&M planning.
Payback bar is scaled ×1 lakh for display: e.g. ₹4,10,000 = 4.1 years.
Need rooftop, ground & floating solar?
Tell us about your project or portfolio — we'll respond within one business day with a tailored engagement outline.
