RE & Energy Storage Advisory & Engineering
BESS & RE design, advisory and modelling for RTC and FDRE, technical & financial due diligence — backed by PMC and independent engineer services.

Utility-scale renewables and storage live or die on the quality of early engineering decisions. Our advisory desk combines resource analytics, detailed engineering and grid expertise so every recommendation is bankable — not just theoretical.
We support developers, industrial off-takers and investors across feasibility studies, BESS & RE detailed design, dispatch modelling, technology selection, owner's engineering and technical & financial due diligence — across solar, wind, small hydro and storage. Our modelling desk advises on Round-The-Clock (RTC) and Firm & Dispatchable RE (FDRE) supply — optimising solar-wind-hydro-storage portfolios against demand profiles, transmission constraints and bid requirements.
Beyond design, we stay accountable through delivery: as Project Management Consultant (PMC) we manage schedule, cost, quality and contractors on the owner's behalf, and as Independent / Lender's Engineer we provide the impartial technical oversight that lenders and investors rely on from construction through operations.
How we deliver
Resource & load analytics
15-minute interval load studies, solar/wind/small-hydro resource assessment and ToD tariff mapping to quantify the real opportunity.
Concept, sizing & RTC/FDRE modelling
BESS power/duration optimisation, hybrid RTC/FDRE portfolio modelling and yield studies with degradation and RTE stress-tests.
Detailed engineering
SLDs, layouts, protection philosophy, grid-connection studies and specifications ready for procurement.
PMC & independent oversight
Project management consultancy through construction, plus independent/lender's engineer reviews and technical & financial due diligence to bankability standards.
Everything this practice covers
Where this practice is heading next
Full-lifecycle project management for RE & BESS programs
From gigawatt-scale solar portfolios to standalone BESS plants — our PMC and owner's engineer practice runs a disciplined, phase-gated regime on the owner's behalf.
Mobilisation & Baselining
- Core team & resident engineers deployed site-wise
- Document environment, dashboards & mobile reporting live
- Level-3 baseline programme agreed and frozen
- Land, design & approval file audit with exception log
- Field Quality Plans & ITPs issued per discipline
Design & Engineering Review
- Design basis, DC:AC ratio, module/inverter & layout verification
- Independent energy-yield re-run vs financial model (P50/P75/P90)
- Civil, electrical, earthing & protection design checks
- Evacuation & interconnection scheme review vs utility requirements
- AFC drawing register, comments log & deviation/waiver control
Procurement & Contract Support
- Technical specs & approved make lists per package
- Independent BoQ take-off and bid evaluation with compliance matrix
- Factory audits, FAT witness & pre-dispatch inspections
- LD, PG, DLP & retention terms drafted into contracts
- Milestone payment schedules tied to certified physical progress
Construction Supervision
- Setting-out, civil, structure & electrical works supervision
- 100% attendance at hold points; witness & review point control
- Daily geo-tagged progress reports and three-week look-aheads
- Stop-work, reject and certify authority exercised on the owner's behalf
- RA bill certification against measured physical progress only
Quality & HSE Assurance
- Hold/witness/review point regime from piling to pre-COD
- NCR issue, ageing and closure management
- Contractor HSE plan approval & permit-to-work oversight
- Incident reporting within 24 hours with root cause in 7 days
- Statutory labour & welfare compliance checks
Schedule & Cost Control
- Critical-path tracking with float consumption reporting
- Earned value (SPI/CPI) reported monthly per cluster
- Delay analysis & recovery plans for slipping milestones
- Variation and change-order evaluation with rate analysis
- Lender drawdown certification against certified milestones
Statutory & Utility Interface
- Connectivity, bay allocation & interconnection approvals
- Electrical inspectorate drawing approval & energisation permission
- Metering, testing & sealing coordination with the utility
- Scheme & domestic-content compliance verification
- Live approvals tracker across all sites
Testing, Commissioning & COD
- Mechanical completion & punch-list closure control
- String IV, insulation, transformer & protection testing witness
- Charging, synchronisation & stabilisation oversight
- Performance guarantee test conduct and certification
- Complete COD dossier: as-builts, warranties & asset register
Defect Liability & Performance
- Defect log with contractor call-out & closure tracking
- Monthly generation vs P50/guaranteed CUF monitoring
- PR trending with root-cause investigation of underperformance
- O&M contract adherence & preventive maintenance audits
- Annual thermography/EL campaigns with condition reports
Get the RE & Energy Storage Advisory & Engineering brochure — our step-by-step process, and how we deliver your objectives in time, at optimal cost, with assured quality.
Instant PDF download — we only use your details to follow up.
RE & Storage Advisory, in 25 seconds.
Who is winning RE & BESS auctions — results as they land.
The power-sector rulebook, in one place.
Solar, wind, BESS, green hydrogen and small hydro schemes — plus open access, merit order despatch and scheduling prioritisation, from official sources only.
MNRE — technology schemes
Solar programmes — PM-KUSUM, rooftop, PLI (MNRE)
The ministry's solar scheme stack — farmer solarisation, rooftop subsidies and module manufacturing PLI.
Wind & Wind-Solar Hybrid Policy
National Wind-Solar Hybrid Policy (2018) and wind bidding framework — hybridisation of existing sites allowed.
National Green Hydrogen Mission (₹19,744 Cr; SIGHT ₹17,490 Cr)
ISTS charge waiver, RE banking and time-bound open access for green hydrogen production.
Small Hydro Power programme
Sub-25 MW hydro — MNRE's SHP scheme, potential mapping and state implementation.
MoP — VGF & market rules
BESS VGF Tranche II (Jun 2025) — 30 GWh, ₹5,400 Cr
VGF at ₹18 lakh/MWh; 25 GWh across 15 states + 5 GWh to NTPC; TBCB for 12-15 years; disbursed 20% at FC, 50% at COD, 30% after year one.
Green Energy Open Access Rules, 2022
Open access from 100 kW sanctioned load, uniform RPO, 15-day nodal processing — the C&I route to green power.
GEOA Procedure Rev 4 (Grid-India, Jul 2024)
Grid-India is the Central Nodal Agency — the operative procedure behind the national open access portal.
CEA / CERC — grid operations
Indian Electricity Grid Code (IEGC) 2023 — must-run & SCED
RE stations carry must-run status; Security Constrained Economic Despatch minimises system generation cost — the merit order in action.
IEGC amendment (Jun 2024) — scheduling prioritisation
Restricts buyers' downward schedule revisions below minimum turndown after 14:30 on D-1 — critical for thermal-RE co-scheduling.
CEA — technical standards & resource adequacy
Connectivity standards, resource adequacy guidelines and national transmission plans underpinning every project.
Monthly policy digest
One email a month with every new or amended policy, GR and regulation our watch caught — no tender watch needed.
The technology and partner ecosystem we work across.
Solar OEMs
BESS OEMs
Expert insights on RE & Storage Advisory.

NETRA visit signals India’s grid-tech push: implications for RE and BESS
What President U Min Aung Hlaing’s NETRA visit likely signals for India’s RE, BESS, tariffs, procurement and project bankability.

Merchant BESS in India 2026: Revenue Stacking, NPV and Bankability
A practical 2026 guide to merchant BESS in India: revenue stacking, tariffs, degradation, debt sizing and bankability.

Indian C&I Renewable Open Access with Storage 2026: Sizing, Charges and Bankability
A practical 2026 guide to C&I renewable open access with storage in India: sizing, wheeling charges, banking limits, tariffs and lender concerns.

India Ancillary Services 2026: BESS Economics, Market Design and Grid Strategy
How ancillary services can unlock BESS value in India in 2026: market design, tariffs, sizing, grid integration and bankability.

Ancillary Services from BESS in India 2026: FCAS Economics, Grid Value and Bankability
How BESS can capture ancillary-service value in India in 2026: market design, sizing, tariffs, grid integration and lender bankability.

Battery Tolling in India 2026: BESS Contract Structures, Tariffs and Bankability
A practitioner guide to battery tolling in India: contract design, tariff benchmarks, dispatch rights, degradation and lender concerns in 2026.

Curtailment Risk in India RE 2026: Grid Integration, Storage and PPA Strategy
How Indian RE projects can price, mitigate and contract around curtailment risk in 2026 using storage, forecasting and PPA design.

India’s Renewable Build-Out Is Entering Its Hard Phase — and That Is Where Strategy Will Decide the Winners
The next decade in renewables will not be won by capacity announcements alone, but by those who can align policy, grid, capital and execution.

India’s Next Renewable Sprint: Strategy, Policy, and the Global Reset Behind It
The next phase of India’s renewable build-out will be won less by ambition alone and more by grid realism, industrial policy, and execution discipline.

FDRE in India 2026: Sizing, Scheduling, Tariffs and Bankability for Hybrid RE
A practitioner guide to FDRE in India 2026: sizing hybrids and storage, scheduling risk, tariffs, DSM, grid integration and financing.
Latest developments — refreshed daily
Curated automatically from news outlets, government releases and industry reports relevant to this practice.
MNRE & CEA updates relevant to re & storage advisory
Only circulars and releases our Vidura tags as relevant to re & storage advisory — auto-updated daily.
Discuss your re & storage advisory mandate.
Tell us where you are in the journey — we'll respond within one business day with a tailored engagement outline.