RE & Energy Storage Advisory & Engineering
BESS & RE design, advisory and modelling for RTC and FDRE, technical & financial due diligence — backed by PMC and independent engineer services.

Utility-scale renewables and storage live or die on the quality of early engineering decisions. Our advisory desk combines resource analytics, detailed engineering and grid expertise so every recommendation is bankable — not just theoretical.
We support developers, industrial off-takers and investors across feasibility studies, BESS & RE detailed design, dispatch modelling, technology selection, owner's engineering and technical & financial due diligence — across solar, wind, small hydro and storage. Our modelling desk advises on Round-The-Clock (RTC) and Firm & Dispatchable RE (FDRE) supply — optimising solar-wind-hydro-storage portfolios against demand profiles, transmission constraints and bid requirements.
Beyond design, we stay accountable through delivery: as Project Management Consultant (PMC) we manage schedule, cost, quality and contractors on the owner's behalf, and as Independent / Lender's Engineer we provide the impartial technical oversight that lenders and investors rely on from construction through operations.
How we deliver
Resource & load analytics
15-minute interval load studies, solar/wind/small-hydro resource assessment and ToD tariff mapping to quantify the real opportunity.
Concept, sizing & RTC/FDRE modelling
BESS power/duration optimisation, hybrid RTC/FDRE portfolio modelling and yield studies with degradation and RTE stress-tests.
Detailed engineering
SLDs, layouts, protection philosophy, grid-connection studies and specifications ready for procurement.
PMC & independent oversight
Project management consultancy through construction, plus independent/lender's engineer reviews and technical & financial due diligence to bankability standards.
Everything this practice covers
Where this practice is heading next
Full-lifecycle project management for RE & BESS programs
From gigawatt-scale solar portfolios to standalone BESS plants — our PMC and owner's engineer practice runs a disciplined, phase-gated regime on the owner's behalf.
Mobilisation & Baselining
- Core team & resident engineers deployed site-wise
- Document environment, dashboards & mobile reporting live
- Level-3 baseline programme agreed and frozen
- Land, design & approval file audit with exception log
- Field Quality Plans & ITPs issued per discipline
Design & Engineering Review
- Design basis, DC:AC ratio, module/inverter & layout verification
- Independent energy-yield re-run vs financial model (P50/P75/P90)
- Civil, electrical, earthing & protection design checks
- Evacuation & interconnection scheme review vs utility requirements
- AFC drawing register, comments log & deviation/waiver control
Procurement & Contract Support
- Technical specs & approved make lists per package
- Independent BoQ take-off and bid evaluation with compliance matrix
- Factory audits, FAT witness & pre-dispatch inspections
- LD, PG, DLP & retention terms drafted into contracts
- Milestone payment schedules tied to certified physical progress
Construction Supervision
- Setting-out, civil, structure & electrical works supervision
- 100% attendance at hold points; witness & review point control
- Daily geo-tagged progress reports and three-week look-aheads
- Stop-work, reject and certify authority exercised on the owner's behalf
- RA bill certification against measured physical progress only
Quality & HSE Assurance
- Hold/witness/review point regime from piling to pre-COD
- NCR issue, ageing and closure management
- Contractor HSE plan approval & permit-to-work oversight
- Incident reporting within 24 hours with root cause in 7 days
- Statutory labour & welfare compliance checks
Schedule & Cost Control
- Critical-path tracking with float consumption reporting
- Earned value (SPI/CPI) reported monthly per cluster
- Delay analysis & recovery plans for slipping milestones
- Variation and change-order evaluation with rate analysis
- Lender drawdown certification against certified milestones
Statutory & Utility Interface
- Connectivity, bay allocation & interconnection approvals
- Electrical inspectorate drawing approval & energisation permission
- Metering, testing & sealing coordination with the utility
- Scheme & domestic-content compliance verification
- Live approvals tracker across all sites
Testing, Commissioning & COD
- Mechanical completion & punch-list closure control
- String IV, insulation, transformer & protection testing witness
- Charging, synchronisation & stabilisation oversight
- Performance guarantee test conduct and certification
- Complete COD dossier: as-builts, warranties & asset register
Defect Liability & Performance
- Defect log with contractor call-out & closure tracking
- Monthly generation vs P50/guaranteed CUF monitoring
- PR trending with root-cause investigation of underperformance
- O&M contract adherence & preventive maintenance audits
- Annual thermography/EL campaigns with condition reports
Get the RE & Energy Storage Advisory & Engineering brochure — our step-by-step process, and how we deliver your objectives in time, at optimal cost, with assured quality.
Instant PDF download — we only use your details to follow up.
RE & Storage Advisory, in 25 seconds.
Who is winning RE & BESS auctions — results as they land.
The technology and partner ecosystem we work across.
Solar OEMs
BESS OEMs
Expert insights on RE & Storage Advisory.

NETRA Net-Zero Energy Transition Association: What It Means for India RE & BESS
NETRA’s new net-zero transition platform could shape India’s RE, storage, tariffs and project bankability in 2026.

NETRA and India’s Net-Zero Transition: What It Means for RE, BESS and C&I Buyers
Expert take on NETRA’s net-zero transition initiative and what it means for India’s RE, BESS, tariffs, procurement and project bankability.

IESA Membership and India’s BESS Market: What It Means for RE Procurement
Expert take on IESA’s industry role and what its membership push signals for India’s BESS, RE tariffs, procurement and bankability.

IESA Membership Matters in 2026: What India Energy Storage Alliance Signals
What joining IESA signals for India’s BESS market, C&I procurement, tariffs, lender confidence and project bankability in 2026.

Ancillary Services from BESS in India 2026: Revenue, Rules and Bankability
How ancillary-services markets can improve BESS economics in India in 2026, with rules, tariffs, dispatch logic and lender concerns.

Ancillary Services from BESS in India 2026: Revenue, Regulation and Project Bankability
How ancillary-service revenues from BESS are evolving in India in 2026, with regulation, tariffs, dispatch logic and bankability implications.

NETRA visit: what NTPC’s R&D spotlight means for India RE and BESS
Myanmar president’s visit to NETRA signals strategic R&D relevance. What it means for India’s RE, BESS, tariffs, procurement and bankability.

IESA says India C&I energy storage may reach 31 GWh by 2032: what it means
What IESA’s 31 GWh C&I storage outlook means for Indian consumers, BESS developers and lenders in tariffs, procurement and bankability.

Open Access BESS in India 2026: Sizing, Charges, Dispatch and Bankability
A practical 2026 guide to open access BESS in India: sizing, charges, dispatch logic, risks and bankable structures for C&I and developers.

Lender’s Engineer for RE, BESS and FDRE Projects in India 2026
How lender’s engineer reviews de-risk RE, BESS and FDRE projects in India in 2026, with bankability checks, risks, timelines and key metrics.
Latest developments — refreshed daily
Curated automatically from news outlets, government releases and industry reports relevant to this practice.
MNRE & CEA updates relevant to re & storage advisory
Only circulars and releases our AI tags as relevant to re & storage advisory — auto-updated daily.
Discuss your re & storage advisory mandate.
Tell us where you are in the journey — we'll respond within one business day with a tailored engagement outline.